Q1: We saw this morning that you’ve had your mining licence in Zambia restored, what are the immediate next steps?

A1: Yes, thank you, it is very welcome news received from the Zambian Ministry. The Kabwe mining licence was suspended in February which we’ve always believed was for the wrong reasons but I’m very happy it’s been reinstated.

Basically, what it means therefore is the project test work, project design work, that we had been doing as a team with the BMR team can now be implemented. So, during this time that the licence was suspended we continued the development of the project, so we’ve continued the test work, the design work, mobilised the project execution team in the hope and in the trust that in fact the licence will be reinstated.

So, the project’s immediate next steps is the team is being sent across to Zambia to now go into full execution mode to construct the processing plant for the treatment of that tailings material, or that surface material. As we said previously, we targeted both lead and zinc plus the vanadium component in those tailings.

 

Q2: How ready are we to execute the project?

A2: We’re fortunate in a way that we’ve been able to leverage the work that was performed by the BMR Group so that we could add to that work a lot of the pre-development and test work and conceptual flow sheet development was performed by BMR. We were therefore in a very fortunate position to be able to take on that work and basically review and optimise the process designs which allowed to reach an execution readiness very quickly on the project.

So, we basically had a point where on the back of that news release, or the flow of information received from the Zambian government, we are ready to commence and mobilise the team within this month, we will basically mobilise and commence execution of that project.

 

Q3: What’s on the cards for Jubilee Metals Group this year then?

A3: We have a very exciting year ahead, very challenging I suppose as well because we’ll be executing in parallel of course beyond the Kabwe project in Zambia, we’ll also be executing our project in South Africa, that’s a chrome and PGM project. It’s also a project that is the processing of material that’s really at surface and that project is scheduled for execution this year.

Of course, then, the third project we are targeting to execute in this year is our Dilokong project which is a platinum recovery project, we’re just waiting there for regulatory approval of our processes to commence the construction of that project as well.

So, we have a busy year with three projects on the cards for execution.

Click to view all articles for the EPIC:
Or click to view the full company profile:
Facebook
Twitter
LinkedIn
Jubilee Metals Group Plc

More articles like this

Jubilee Metals Group plc

Jubilee Metals reports record chrome production levels

Jubilee Metals Group PLC (LON:JLP), a leading diversified metals processor in Africa with significant operations in South Africa and Zambia, has published its Operational Update and production figures for the quarter ended 31 March 2024 and also provides

Jubilee Metals Group plc

Copper demand surges amid global supply challenges

In the midst of global supply challenges, copper demand remains robust, propelled by the energy transition and advanced technologies such as artificial intelligence (AI). This mounting demand signals a bullish market trend for the versatile metal,

Jubilee Metals Group plc

Copper Demand and Price Surge: A Boon for Jubilee Metals Group plc

Copper prices have surged, trading near a 15-month high. This spike, driven by concerns over supply and optimistic demand forecasts, marks a significant phase in the commodity’s market behavior. Jubilee Metals Group plc (LON:JLP), with its strategic operations

Jubilee Metals Group plc

Copper prices rise as Chinese inventories slow

London copper prices rose on Monday, rebounding from a weekly loss, as the piling up of inventories in top consumer China slowed. Three-month copper on the London Metal Exchange (LME) CMCU3 rose 0.5% to $8,912 a metric ton

Jubilee Metals Group plc

Chinese smelters’ production cut boosts Copper prices

Copper prices soared on Wednesday to their highest in seven months after Chinese smelters, which process half of the world’s mined copper, agreed on a joint production cut. Benchmark three-month copper on the London Metal Exchange

Jubilee Metals Group plc

Copper prices set to surge 75% in next 2 years

Increased demand for copper, flagging supply, as well as falling dollar strength in the second half of the year paint a constructive outlook for copper prices. For investors looking at both the short-term and long-term potential