CEO Q&A with Leon Coetzer at Jubilee Metals Group PLC (LON:JLP)

Jubilee Metals Group PLC (LON:JLP) Chief Executive Officer Leon Coetzer caught up with DirectorsTalk for an exclusive interview to discuss their latest Kabwe project update.

 

Q1: From the Kabwe project update this morning, I note that you are constructing the processing plant whilst certain sections have been developed. Could you provide some more clarity on how that’s been done and how the risks of the project have been mitigated now?

A1: Clearly, this is not a typical way of executing the project where you are both constructing and developing that process and really comes back to the point that previously the process flowsheet or the process design that was intended for this project was based on a process developed by BMR, which is our partner and owner of the company called EPL. They developed a process in a laboratory based on batch testing and during those processes, it was the complexity of actually integrated such batch tests at laboratory-scale into an integrated flowsheet was not well understood.

Jubilee Metals and its technical teams then took the decision to rather simplify the process flowsheet and apply a very prudent test programme per sub-unit process. When I say sub-unit process, what I mean is we broke the project up into each defined steps being a zinc recovery circuit, a lead recovery circuit, a vanadium recovery circuit and a final tailings treatment facility so we do not try and solve all of these four processes within a single process unit.

That allowed us to accelerate the test work of the systems, so we have our teams testing, developing each sub-unit process, once that sub-unit process is developed, it’s handed over to our engineering team to do the designs and then finally over to the execution teams. This is why we’re in this position where the zinc recovery circuit has been concluded, execution teams is now running with that unit process to implement that unit process whilst our development teams are in between testing and designing for the lead and the vanadium circuit.

Of course, we have to do that because a lot of time has been lost on this project and we have to make up for that lost time to still have a project implemented over the next 12 months in Zambia. Of course, the prize is big enough, we’re talking about 6.5 million tonnes of very lead and zinc-rich material on surface that we are chasing.

 

Q2: You mentioned that discussions with the Zambian government is ongoing, how critical are these discussions to the success of the project?

A2: As you know, the project had a chequered history with the Zambian government, firstly losing its mining licence and then having it reinstated again, clearly this project has suffered many many delays over the past years and many promises have been made to government on the execution of that project.

It’s in an area desperately needing investment, job creation and successful projects so it’s vitally important that the Zambian government is continuously informed on what is happening on this project, As Jubilee Metals, we have to unequivocally show not only progress on the development of the process but very much continuous progress on and at site as we implement the project.

So, the discussions are very important and there’s no defined discussion target other than continuously ensuring that the government is update and in support of what we’re doing at that project.

Click to view all articles for the EPIC:
Or click to view the full company profile:
Facebook
Twitter
LinkedIn
Jubilee Metals Group Plc

More articles like this

Jubilee Metals Group plc

Jubilee Metals reports record chrome production levels

Jubilee Metals Group PLC (LON:JLP), a leading diversified metals processor in Africa with significant operations in South Africa and Zambia, has published its Operational Update and production figures for the quarter ended 31 March 2024 and also provides

Jubilee Metals Group plc

Copper demand surges amid global supply challenges

In the midst of global supply challenges, copper demand remains robust, propelled by the energy transition and advanced technologies such as artificial intelligence (AI). This mounting demand signals a bullish market trend for the versatile metal,

Jubilee Metals Group plc

Copper Demand and Price Surge: A Boon for Jubilee Metals Group plc

Copper prices have surged, trading near a 15-month high. This spike, driven by concerns over supply and optimistic demand forecasts, marks a significant phase in the commodity’s market behavior. Jubilee Metals Group plc (LON:JLP), with its strategic operations

Jubilee Metals Group plc

Copper prices rise as Chinese inventories slow

London copper prices rose on Monday, rebounding from a weekly loss, as the piling up of inventories in top consumer China slowed. Three-month copper on the London Metal Exchange (LME) CMCU3 rose 0.5% to $8,912 a metric ton

Jubilee Metals Group plc

Chinese smelters’ production cut boosts Copper prices

Copper prices soared on Wednesday to their highest in seven months after Chinese smelters, which process half of the world’s mined copper, agreed on a joint production cut. Benchmark three-month copper on the London Metal Exchange

Jubilee Metals Group plc

Copper prices set to surge 75% in next 2 years

Increased demand for copper, flagging supply, as well as falling dollar strength in the second half of the year paint a constructive outlook for copper prices. For investors looking at both the short-term and long-term potential